How Long Does a Home Remodel Take?


Setting Expectations

If you’re considering a remodel, you’re probably asking the same question most homeowners do: “How long is this really going to take?” The answer isn’t simple, because a remodel is more than just swinging hammers—it’s planning, design, permitting, and yes, construction. To make the process less overwhelming, the experts at Keselman Construction Group break the journey into four phases, each with its own timeline and challenges.


Phase 1: Discovery & Initial Planning

Every remodel begins with a conversation. A project specialist comes to your home, listens to your goals, documents photos and measurements, and prepares a preliminary estimate.

  • Cost: Usually complimentary
  • Purpose: A reality check to see if your ideas align with your budget
  • Pro Tip: Use this time to ask questions and explore possibilities—you’re not locked in yet.

Phase 2: Design & Development (≈ 4–8 weeks)

This is where ideas start to become reality. Architects and designers sketch layouts, create renderings, and help you visualize the finished space. Along the way, the estimate is refined as decisions are made.

  • Timeline factors: How quickly you make decisions on finishes and layouts
  • What to expect: Adjustments to the scope and cost as details get fine-tuned
  • Pro Tip: The more decisions you make early, the smoother the rest of the process will be.

Phase 3: Pre-Construction & Permitting

Before construction crews arrive, logistics need to be nailed down. This includes pulling permits, confirming site access, scheduling crews, and introducing your dedicated project manager.

  • Focus: Preventing surprises by clarifying details up front
  • What you’ll discuss: Work hours, parking, protecting existing finishes, and site rules
  • Pro Tip: Ask your project manager what you can do to prep your home for minimal disruption.

Phase 4: Construction

Now the heavy lifting begins. Depending on the type of project, build times vary:

  • Bathroom remodel: 4–6 weeks
  • Kitchen remodel: 8–12 weeks
  • Whole-home remodel: 4–8 months

But even the best-planned projects can hit bumps. Hidden issues behind walls, material delays, or mid-project changes can extend timelines.

  • Pro Tip: Order materials early and stick to your decisions to keep the project moving.

The Misconception

Many contractors quote only the construction time, skipping the months of planning and permitting. That’s why homeowners are often surprised when a bathroom remodel takes 2–3 months in total, or a full kitchen takes 3–5 months from first meeting to final inspection.


Final Takeaway

A remodel isn’t a weekend project—it’s a journey. From initial planning to final clean-up, expect:

  • Bathrooms: 2–3 months total
  • Kitchens: 3–5 months total
  • Whole-home projects: 6–12 months total

The good news? With thoughtful planning and a reliable team, the process is manageable—and the result is worth every step. Take the time to plan carefully, communicate openly, and trust the process. Your future home will thank you.